Construction Cleaning
Buildings Before Turnover
Thoroughly clean all surfaces as necessary to create a finished and new appearance. Clean floors and apply the required coatings, sealers and/or waxes. Clean all plumbing and electrical fixtures. Clean all glass. Clean counter tops, cabinetry, trim, moulding and doors. Clean appliances. Clean inside cabinets, drawers and closets. Clean shelves, ledges and overhangs.
Remove all materials from cabinets, drawers, closets, shelves, ledges and overhangs and place them in the designated post-construction staging area. Remove all waste canisters, empty their contents into outdoor receptacles and stack the containers in the recycling area.
Clean around, under and over heating, ventilation and air conditioning equipment. Clean the spaces around water heaters. Clean the tops of water heaters.
Felons are encouraged to apply!